Commercial
and Industrial
You saved us from a
million dollar
outage. This was a
cheap insurance
policy for the
million dollar
outage you
prevented.” Note: A
DC HIPOT test was
performed just prior
to using the IMCORP
PD Diagnostic Test.
– Project
Engineer, Large
Petro-Chemical
Company, TX
By identifying
the defective splice
before failure, you
just paid for all of
the testing we have
done! –Casino
Utility Manager,
Large Casino, CT
Cooperative Utility
The exit feeder
where
you found the cable
defect would have
taken out a number
of the circuits.
Management has put
offline PD testing
into our preventive
maintenance
specifications.
–Engineer, Utility
Coop, TN
Wind
Energy
IMCORP’s work at
our site was
professional,
efficient, and
provided excellent
communication
through out the
testing process.
IMCORP personnel
were very
interactive with
site employees and
the additional
contract personnel
assigned to this
task. They were
willing to adapt
their test
procedures to match
our site conditions.
Their experience
with wind farm
operations also led
to limited downtime
and lost production.
IMCORP met and
surpassed our
expectations. If the
need arises, we will
most certainly look
to them to provide
our collector system
testing needs. –Wind farm Operations
Regional Manager, NY
It is difficult on a
wind farm to
maintain high
turbine availability
when the collection
system is
unreliable. Wind
farm cable failures
will never happen at
a convenient time.
Off-line power
frequency PD
diagnostics is the
proactive approach
to collector system
reliability. Proper
planning and
preparation is key
to minimizing down
time and a
successful cable
reliability program.
–Windfarm Project
Manager, CO
VLF HIPOT and
Tangent Delta tests
indicated our cables
were reliable. We
have had 4 failures
since we energized
our system. We
learned absolutely
nothing from these
tests. -Large
Utility/Wind farm
Owner
Engineering
‘the off-line power
frequency partial
discharge diagnostic
method duplicates
the cable
manufacturers’ test
procedures as close
as technically
possible for a field
test. It is the best
way to insure that
not only your cable
and accessories meet
the established IEEE
cable system
standards, but that
the installation of
the system will meet
the criteria also.”
-Consulting
Engineer, Portland,
Oregon
Large
Utility
We use 60Hz PD
diagnostics because
we want to get the
most benefit for our
cable replacement
dollar.
Our company tried a
0.1Hz tangent delta
testing technology
and found that all
of our aged cables
were … aged! We also
did not find good
correlation between
the measured tangent
delta value and the
recorded failure
history of the cable
segments. This did
not help us because
we want to know
which cables are the
worst, so we threw
out that idea. -Sr. Engineer,
Large Utility, CO
I know that we are
injecting a lot of
good cable. We are
looking to 60Hz PD
diagnostics to help
us direct our cable
rehabilitation
program.
In the past, our
cable replacement
program was based on
antidotal evidence
and the squeaky
wheel getting the
oil. Now we are
looking to 60Hz PD
diagnostics to help
us prioritize our
cable reliability
program. -Sr. Engineer,
Large Utility, TX
After starting our
cable reliability
program with IMCORP,
our buried system
had a 50% drop in
failures in
the first year we
have maintained this
improvement.
We have tried
every cable test on
the market and
nothing has compared
with the performance
of the IMCORP PD
test. -Sr. Engineer,
Large Utility, FL
We compared an
online testing
company with the
IMCORP test. The
other company never
mentioned anything
about systematic
and severe problem,
but with IMCORP
technology the
problem was easily
identified. It stuck
out like a sore
thumb.
In the past, when we
applied the DC or VLF HIPOT we
experienced several
insulation failures
per year on our new
substation exit
cables. Since we
started using the
IMCORP test 4 years
ago we haven’t had
any. -Sr. Engineer,
Large Utility, WI
|